Infrastructure
Team:
7 Core Members
80 Skilled Staff & Laborers
Area of the Factory:
10,000 m2 + 900 m2 + 1300 m2 (rented for 10 years)
Production Capacity:
Recycling 160 tons of used engine oil per day,
225 tons of fractional distillation products per day
Transportation Fleet:
16 pick-ups with 3.5 tons pay load capacity
4 tankers with 50 tons pay load capacity
1 tupper with 18 tons capacity
Storage capacity:
5000 tons
Technology:
Used oil recycling – high vacuum distillation with solvent treatment
Fractional distillation – Structured packing columns
Total Investment: AED 55 million dirhams
Networks:
Fujairah, Sharjah and Ajman